How long does a kitchen renovation take in Melbourne?
"How long will I be without a kitchen?" is one of the first questions we hear. The honest answer depends on your design, your materials and your home. Here is how the process works, so you can plan around it. Stage 1. Consultation and design It starts with a free consultation, in our South Melbourne showroom or at your home. We talk through layout, materials and budget, then develop the design with you. This stage runs on your pace, so it is the one you can control most.
Stage 2. Approving the final design Once you approve the final design, the clock for making and installing starts. Take the time you need here. Changes after approval are what slow projects down.
Stage 3. Making your cabinetry & cutting your stone Your joinery is made in-house at our Melbourne workshop rather than built on site, keeping quality consistent.
Stage 4. Delivery and installation The timing of this depends greatly on the project that we are undertaking. If it is simply joinery of a kitchen, this typically takes 10-12 weeks after the final design has been approved.
What can change the timeline Stone selection, appliance choices, and whether plumbing or electrical work is involved.
Tips to keep things moving
Choose materials early. Samples can come to you.
Decide appliances before final design.